Real custom work was required when it came to integrating the new grandstand. Of course, the available space was to be used optimally and provide seating for as many visitors as possible. At the same time, it was important not to change the historical substance at any point. A puzzle that we solved perfectly because of the enormous flexibility of the NUSSLI system material, which we then sold.