The basic structure of the temporary hall consists of our system material, which does not require foundations. ‘The construction of the sports hall is based on a proven modular construction system,’ explains Roman Horisberger, Project Manager at NUSSLI, adding: ’The prefabricated wooden modules for the changing rooms and equipment rooms were already equipped with all the necessary pipes, connections and sanitary facilities during production. This allowed us to keep the assembly time on site short.’ Wooden modules and pollutant-free building materials ensure a pleasant indoor climate.