Remote event locations like here on the mountain are exciting challenges for us. For this project, the material has to be transported up the mountain by train. A logistical challenge that we successfully master year after year. With good organization and preparation, almost anything is possible. In total, the crew brought 85 tons of material with them and used it to build not only the stage but also various event structures such as a front of house or substructures for LED screens.