In Höhenkirchen and Planegg, 7 two-story, architecturally appealing homes were created in prefabricated wood construction technique as refugee accommodation. These were carried out with 4 separate accommodation units, common rooms and spaces for social care and training. Highest environmental quality standards have been set for the building materials. NUSSLI Group‘s task was the turnkey construction of these houses, including all fixtures and fittings in less than 3 months. The task of NÜSSLI Gruppe was planning, execution and turnkey built of all houses in less than 3 months.