Customer comments.
Stadium extension Cape Town Stadium , 2010 FIFA World Cup South Africa™
Cape Town, 26. September 2010 «... NUSSLI's professionalism and support throughout the draft design and procurement phases, their prompt reaction to changes and timing of the works, together with the competitive pricing, were exemplary....»
I.G. Taylor
Director, Project Manager / Principal Agent
MITCHELL DUPLESSIS ASSOCIATES
Pavilion construction on highest level - Serpentine Gallery in London
London, 28.09.2008 «... We are proud and delighted to have commissioned this structure by Olafur Eliasson and Kjetil Thorsen. We have already had a positive response from both the media and visitors to the Pavilion, and we are sure it will continue to be very popular. It would not have been possible to realise this extraordinary project, as well as the accompanying publication, without the support of many organisations and individuals. On behalf of the Serpentine Gallery, we would therefore like to take this opportunity to thank you once again for your important contribution towards making this possible.»
Julia Peyton-Jones
Director, Serpentine Gallery and Co-Director, Exhibitions and Programmes
Hans Ulrich Obrist
Co-Director, Exhibitions and Programmes and Director, International Projects
Temporary constructions for the Olympic Winter Games in Torino
Turin, 15. Mai 2006 «...NÜSSLI (Deutschland) GmbH, Germany and the other companies of the NÜSSLI Group contributed greatly to the success through their involvement in four of the high profile venues such as the Freestyle Venue in Sauze d'Oulx, the Snowboard Venue in Bardonecchia, the Olympic Village also in Bardonecchia and the Ice Hockey 2 Venue in Torino Esposizioni - Torino. (...) NÜSSLI provided a high level of professionalism, expertise and flexibility, which ensured each Venue was completed on time and provided excellent sightlines and comfort for the spectators...»
Emanuele Rossetti
Head of Venue Overlay Infrastructure and Utilities
Event planning for the FIS Alpine World Ski Championships in Bormio
Bormio, 18. März 2005 «...For all modular infrastructures for the event from design to tendering the Organizing Committee appointed NÜSSLI International Ltd in April 2003 as their overlay planner.
The initial project was started on the 7th of April and was finished by the 21st of August 2003. The detailed planning of the temporary facilities in phase B included a check of requirements, preliminary project plans, a check of critical issues, scheduling and milestone-planning and a cost estimate which was exact to +/- 10% for the grandstands, VIP hospitality, main press centre, containers and other facilities. This phase was finalised by the 26th of March 2004. By the 13th of August the final project, including a check of the requirements, a detailed master plan, project drawings of all main items, a definitive seating bowl-plan, a definition of the scope of works, technical descriptions and specifications and preparing tendering, was concluded.
During these phases NÜSSLI International Ltd strongly supported the Organizing Committee in its goal to plan effectively the necessary temporary facilities so that an integration between the local authorities' concept of permanent structures, and a 360° vision which included logistical and transport-related matters was guaranteed...»
Beppe Bonseri
Managing Director
Grandstands for the Olympic Summer Games in Athens
Athen, 15.11.2004 «...NÜSSLI (Switzerland) Ltd. contributed greatly to the success through their involvement in twelve of the high profile venues such as the Beach Volleyball venue and the Faliron Sports Pavilion at Faliron, the Basketball arena, the Fencing hall, the Baseball field 1 and field 2, the Softball venue and the Hockey field 1 and field 2 at Hellinikon, the Triathlon venue and the Cycling time trail venue at Vouliagmeni as well as the Table tennis and Gymnastic venue at Galatsi. For these twelve venues NÜSSLI provided all temporary grandstands, camera platforms...
NÜSSLI (Switzerland) Ltd. provided a high level of professionalism, expertise and flexibility, which ensured each venue was completed on time and provided excellent sightlines and comfort for the spectators...»
Yannis Pyrgiotis
Executive Director
A stage for the pope in Freiburg
Freiburg, July 29, 2004 «...We are writing to you on behalf of the entire Organising Committee and the Swiss Bishops' Conference. The reason for this letter is simple. Over the past weeks and months we have been able to count on your help and support during the preparations for and management of the 1st National Catholic Youth Meeting and the Papal Visit. Your stage design was extremely professional and elegant and met with universal approval. The dimensions of the stage and of the visitor sectors blended ideally into the Grosse Allmend. We should like to express our warmest thanks for your commitment, hard work and excellent collaboration. Without you and other institutions and companies an event of this sort would never have been possible...»
Monsignor Denis Theurillat
Auxiliary Bishop of Basel and Youth Bishop
Swiss Bishops' Conference
21 stages on several locations - Grönemeyer Tournee
Cologne, June 24, 2003 ...Grönemeyer Tour «...I should like to thank you personally and on behalf of Mr. Grönemeyer for the professional management of the Grönemeyer Tour.
Between 8 May and 7 July 2003 a total of 21 stage structures were created in Germany, Austria und Switzerland to our complete satisfaction...»
Klaus Ulrich










